ItemUnitPKR FromPKR to
Bricksper 10009,00012,500
Cementper bag590610
Iron Bar (Sarya)per ton105,000120,000
Crush (Bajri, Dumper rates)CFT5055
Sand (Dumper rates)CFT2025
MarbleSFT35300
TilesS Meter8002,000
Sanitary Fittings (pipes)RFT3045
Sanitary Fittings (Bathroom set)Per piece8,00020,000
Sanitary Fittings (gyser)per piece15,00025,000
Electric Fittings (Cable)R Meter1120
Electric Fittings (Lights)Per piece3003,000
Electric Fittings (Fans)Per piece1,5004,000
Electric Fittings (AC)per piece30,000100,000
Main GatePer piece10,00040,000
Doors (normal size)Per piece4,50030,000
Windos (Aluminium)SFT400600
Interior Wood works (with materials)SFT700800
Interior Wood works (without materials)SFT125175
Lasani Sheet (4"*8")per piece1,4001,500
Lamination Sheet (4"*8")per piece2,1002,200
Paint/distamperper bucket1,0004,000
Labour Grey Structure complete (W.o. material)SFT250300
Labour complet turnkey (W.o. material)SFT400500
Complete construction cost (with materials)SFT1,8004,000