Item | Unit | PKR From | PKR to |
Bricks | per 1000 | 9,000 | 12,500 |
Cement | per bag | 590 | 610 |
Iron Bar (Sarya) | per ton | 105,000 | 120,000 |
Crush (Bajri, Dumper rates) | CFT | 50 | 55 |
Sand (Dumper rates) | CFT | 20 | 25 |
Marble | SFT | 35 | 300 |
Tiles | S Meter | 800 | 2,000 |
Sanitary Fittings (pipes) | RFT | 30 | 45 |
Sanitary Fittings (Bathroom set) | Per piece | 8,000 | 20,000 |
Sanitary Fittings (gyser) | per piece | 15,000 | 25,000 |
Electric Fittings (Cable) | R Meter | 11 | 20 |
Electric Fittings (Lights) | Per piece | 300 | 3,000 |
Electric Fittings (Fans) | Per piece | 1,500 | 4,000 |
Electric Fittings (AC) | per piece | 30,000 | 100,000 |
Main Gate | Per piece | 10,000 | 40,000 |
Doors (normal size) | Per piece | 4,500 | 30,000 |
Windos (Aluminium) | SFT | 400 | 600 |
Interior Wood works (with materials) | SFT | 700 | 800 |
Interior Wood works (without materials) | SFT | 125 | 175 |
Lasani Sheet (4"*8") | per piece | 1,400 | 1,500 |
Lamination Sheet (4"*8") | per piece | 2,100 | 2,200 |
Paint/distamper | per bucket | 1,000 | 4,000 |
Labour Grey Structure complete (W.o. material) | SFT | 250 | 300 |
Labour complet turnkey (W.o. material) | SFT | 400 | 500 |
Complete construction cost (with materials) | SFT | 1,800 | 4,000 |